loading

 sales@gsl-energy.com     0086 13923720280

perseverance petite, motorized

\"Perseverance is petite, mobility\" is the motorized version of my previous model \"Perseverance is petite.
I designed, assembled and tested this model for solar charging power.
Using this power supply, I can put the model near the window, the solar cell facing the sun, it runs day and night without using the power supply or replaceable battery.
I also found that the charger works well under halogen lamps, contrary to the sun, but that goes against purpose!
As described in the first step, you will need to purchase the gear motor and the electric source to complete the \"Perseverance is petite, motorized \".
Besides \"base \".
Stl \"and\" Shaft Gear for motor.
Stl \", all parts can be exchanged with\" perseverance, petite.
As usual, I may have forgotten one or two files or who knows what else, so please don\'t hesitate if you have any questions as I do make a lot of mistakes.
Design with Autodesk Fusion 360 and slice with Cura 2. 5.
0, and print with PLA on the Ultimaker 2 extension and Ultimaker 3 extension.
To complete this model, as mentioned earlier, you will need to purchase the gear motor and power supply.
The gear motor I use is 6VDC 60 rpm gear motor (
\"Mini Metal Gear motor GA12-DC 6 V 30 RPM 3mm shaftN20\")
I found it on Amazon, but there are many other vendors.
The power I use is solar charging.
7 mAh lithium battery power supply from Adafruit.
The components are solar panels (
6 v 2 w solar panel-2. 0 w pid: 200)
Adapter cable (3. 5 / 1. 3mm or 3. 8 / 1. 1mm to 5. 5 / 2.
1mm DC jack adapter cable PID: 2788)
Solar Charger (
USB/DC/solar lithium ion/polymer charger-v2 PID: 390)and battery (
Lithium ion polymer battery-3.
7 v 2500 mAhPID: 328)
However, you can use any 1.
Power supply or battery from 5 to 6vdc.
If you choose the power supply I use, assemble it according to the instructions.
The power supply I chose was the JST connector with red and black wires.
I weld the red line to the motor terminal and the black line to the motor --terminal.
I printed all the parts on one extended Ultimaker 2 and extended Ultimaker 3.
1mm vertical resolution.
I have attached a PDF with the name, quantity, fill, Edge, raft and support settings for each part.
Test fit and trim, documents, sand, etc before assembly.
Moving the surface smoothly moves all the parts required, as well as the tight fit of the non-moving surface.
Depending on the color you choose and the printer settings, more or less trim, archiving, and/or sanding may be required.
Carefully archive the edges of all contact build boards to ensure that all build boards \"ooze\" are removed and all edges are smooth.
I used small jeweler documents and was patient enough to perform this step.
The model uses a threaded assembly and all threads are M6 by 1.
Please note that in PDF, I have printed certain parts with threaded holes on the raft so that it is easier to clean up these parts for post-printing.
If, after printing, the threaded holes are difficult to install the parts into them, then clean them using M6 of 1 steel screw or M6 of 1 tap.
I also printed the \"Torso \".
Stl \"and\" base with motor support.
Stl \"uses edges during printing to help keep these parts in place.
Connect the two arms. stl\" to \"Torso.
Stl \"uses two\" shaft arm Leg Torso. stl\" as shown.
The arm should turn freely.
\"Lower left leg.
Stl \"to\" on the upper left leg \".
Stl \"uses\" lower shaft legs. stl\".
The lower leg should turn freely.
Connect the legs to the right.
Stl \"to\" the upper right leg.
The Stl \"uses the remaining\" shaft legs are lower. stl\".
Again, the calf should be turned freely.
Use a \"shaft arm Leg Torso to connect the left leg assembly to the left side of the torso. stl\" as shown.
Components should turn freely.
Connect the right leg assembly to the right side of the torso using the remaining \"shaft arm Leg Torso. stl\" as shown.
Again, the components should turn freely.
Idler wheel using shaft gear.
Connect the two straight gears (20 teeth).
Create \"stl\" for large idler wheel assemblies \".
As shown in the figure, make sure the assembly is tight, the teeth of the straight gear are aligned, and the two gears are parallel to each other.
Slide this component into Base \".
Stl \"is in the position shown, fixed in place with two\" shaft gears. stl\".
Once fixed, the large idler wheel assembly should rotate freely in the base.
Install the remaining \"straight gear (20 teeth).
Stl \"is shown in the figure and fixed in place using two\" eccentric legs. stl\".
When firmly tightened, the two eccentricity must be 180 degrees apart (
When one eccentric points straight up, the other must point straight down).
If the distance between the two eccentric objects is not 180 degrees when they are firmly tightened, remove them, make a small ball with a 4mm square paper towel and place it in the gear thread, then reinstall eccentrics and try again.
After completion, the gear should rotate freely in the base.
Install the first \"straight gear (10 teeth).
Stl \"enters the 10 tooth positions of the lowest straight gear in the base, as shown in the figure, and is fixed in place using two\" shaft gears. stl\".
Test to make sure the gear rotates freely in the base.
Install the second \"straight gear (10 teeth).
Stl \"enters the 10 tooth positions of the highest positive gear in the base, as shown in the figure, and is fixed in place using a\" shaft gear.
Stl and an eccentric torso. stl\".
The gear should rotate freely on the base.
The last straight gear 10 teeth is installed in the 10 teeth position of the Central straight gear.
After this gear is installed, \"eccentric torso.
Stl \"must point to the rear of the base (
On the right side of the photo)
Left \"eccentric leg.
Stl \"must be pointed down.
To do this, rotate the left \"eccentric leg.
Stl \", point it straight down and rotate the\" eccentric torso.
Stl \", point it straight down, and then slide the final\" straight gear (10 teeth).
The position between the first two straight gears of Stl (10 teeth). stl\".
When sliding the final straight gear into the position, keep the \"eccentric leg \".
Stl \"pointing down, allowing\" eccentric torso.
Rotate \"stl\" to position.
Fix the final straight gear 10 teeth in place using a \"shaft gear.
Stl for motor and one shaft gear. stl\".
Shaft Gear for motor.
Stl \"is installed on the motor mounting side of the base.
Make sure all the gears are free to turn.
Install \"arm trunk short.
Stl \"is placed into the base at the position shown using\" shaft arm trunk short. stl\".
The arm should rotate freely on the base.
Next install \"arm trunk length.
Stl \"in place\" as shown with two axis arms \". stl\".
Connect the end of \"arm trunk length.
There is a small stl \"eccentric torso\" on the arm \".
The center of Stl \"and\" arm trunk short. stl\".
After installing these arms, the gear should rotate freely.
Install a \"short arm leg.
Stl \"enters the base at the position shown using one\" shaft arm. stl\".
The arm should rotate freely on the base.
Next, install \"long arms and legs.
Stl \"in place\" as shown with two axis arms \". stl\".
Connect the end of \"long arms and legs.
Stl \"eccentric legs\" with no small dots on the surface of the arm \".
Center to short arms and legs \". stl\".
After installing these arms, the gear should rotate freely.
Repeat the process for the remaining edges.
Finally, rotate the shaft gear of the motor.
Stl \", align the motor shaft hole with the motor shaft, and then push the motor into the base as shown.
Connect the character arm to the base using the shaft arm. stl\" as shown.
Connect the character torso to \"arm trunk length \".
Stl \"uses\" axis torso. stl\" as shown.
Connect the character leg to two \"arm Leg Length.
Stl \"uses two\" axis arms. stl\" as shown.
Connect the motor to the power supply and it will disappear!
If your model does not go, remove the motor from the base and rotate the Gear System by hand to ensure that the gear system rotates freely and the character moves freely.
Congrats, you\'re done!
Hope you like it!

GET IN TOUCH WITH Us
recommended articles
SERVICE INFO CENTER Knowledge
Embarking on a New Era of Smart Energy Storage! GSL ENERGY and Huawei Grid Connection System Reach Communication Agreement
On July 1, Shenzhen GSL Energy Co., Ltd. announced that its core equipment has successfully integrated the communication protocol with Huawei's smart photovoltaic grid connection system. This cooperation marks a further deepening of integration between the two parties in the field of smart energy storage, laying a solid foundation for promoting the global user-side energy storage market.
Common Questions About Commercial Battery Energy Storage Systems
As electricity prices become more volatile, electricity demand rises, and renewable energy becomes increasingly widespread, commercial battery energy storage systems (C&I BESS) are emerging as a critical tool for businesses to reduce costs, improve efficiency, ensure reliable power supply, and advance green transformation. This article will provide a comprehensive analysis of the core architecture, operational mechanisms, application advantages, and typical use cases of commercial energy storage systems, showcasing how GSL ENERGY leverages safe, intelligent, and efficient energy storage solutions to help businesses achieve a more controllable and sustainable energy future.
Malaysia Solar Battery Storage Solutions for Homes & Industry
Discover Malaysia's solar battery storage opportunities for homes and businesses. Learn about residential battery backup, commercial BESS systems, and real GSL ENERGY installations. Get expert pricing insights and storage solutions tailored for Malaysia's energy landscape.
Vietnam Solar Battery Solutions for Homes & Businesses

Explore Vietnam's growing demand for solar battery storage across residential and commercial sectors. From home backup systems to large-scale BESS battery energy storage, GSL ENERGY offers tailored lithium solutions optimized for Vietnam's climate and energy challenges. Discover real installation cases, price insights, and how to choose the right solar battery partner.
Iraq Solar Battery Companies & Energy Storage Solutions

Iraq is entering a transformative phase in its energy landscape. With rising electricity demand, unstable grid performance, and frequent blackouts—particularly during peak summer months—solar battery storage systems are gaining traction across residential, commercial, and off-grid sectors.

Although Iraq possesses vast oil reserves, the country faces serious challenges in ensuring 24/7 power access for all citizens. This gap has accelerated interest in solar energy, especially when combined with solar battery backup systems to provide reliable and independent power.
Ecuador Solar Battery Companies & Energy Storage Solutions
Ecuador is rapidly emerging as a promising market for solar battery storage, driven by growing demand for clean, stable, and off-grid energy solutions. With high solar irradiance and rising electricity costs, both residential and commercial users are turning to lithium-based solar batteries to ensure energy security and reduce diesel dependence. In this article, we explore key trends in Ecuador’s solar battery market, price factors, and how GSL ENERGY supports the country’s energy goals with real-world installations, advanced LiFePO₄ battery technology, and customizable storage systems from 10kWh to 5MWh.
Kenya Solar Battery Company & Energy Storage Solutions
Kenya is rapidly emerging as one of Africa's leading renewable energy markets, driven by government initiatives and growing demand for solar battery storage and off-grid solutions. In many regions, over 75% of residents still lack access to a reliable power grid, making solar power battery systems essential for energy equity, resilience, and long-term cost savings.With average solar irradiance between 4–6 kWh/m²/day, Kenya is perfectly positioned for the adoption of solar battery backup systems in both urban and rural settings.
Philippine Solar Battery Company & Solar Storage Solutions

The Philippine solar market is undergoing rapid transformation, driven by both government initiatives and increasing consumer demand for clean energy. The Philippine Energy Plan outlines the goal of reaching 20 GW of renewable energy capacity by 2040 (or 15 GW by 2030), a target that positions solar energy at the center of national development.
GSL ENERGY's 25kWh stackable solar batteries successfully installed in Mauritius

Amidst the challenges of unstable power grids, rising electricity prices, and overreliance on diesel generators in multiple African countries, an increasing number of businesses and households are actively seeking cleaner and more reliable energy solutions. In March 2025, GSL ENERGY completed the installation of a 25kWh stackable home energy storage system in Mauritius, providing local households with a clean and stable power supply while adding another case study to Africa's clean energy development.
Installation of 40kWh server rack solar batteries and Deye inverters in Israel

Installation of 40kWh server rack batteries and Deye inverters in Israel

Installation Date: January 3, 2025
Installation Location: IsraelProject Type: Small to Medium-Sized Commercial Energy Storage System
System Configuration: 40kWh GSL Server Rack Battery + Deye Inverter
no data
 Service Tel: +86-755-84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leader of green energy provider in china since 2011

0086 13923720280

Solar energy storage battery manufacturer contact information
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect