8MWh Liquid-Cooled Microgrid Energy Storage Solution (CESS-125K418 BESS Battery)

Hybrid On/Off-Grid | PV + Grid + Load + Generator Full Coupling
Зміст

CESS-125K418 is an 8MWh-class liquid-cooled battery energy storage solution purpose-built for commercial & industrial (C&I) sites and microgrids. Designed with a hybrid on/off-grid architecture, the system can simultaneously integrate PV, utility grid, critical loads, and diesel generators, enabling coordinated multi-energy dispatch and highly reliable power delivery.

The solution supports up to 10 parallel inverter sets and up to 20 liquid-cooled battery cabinets in one system. A single configuration delivers 8.36MWh of storage, 1250kW AC output, and up to 2500kW DC PV input—ideal for high renewable penetration, peak shaving, and resilient microgrid operation.

8MWh Liquid-Cooled Microgrid Energy Storage Solution (CESS-125K418)

Core System Composition

    Liquid-cooled battery cabinets × 20 (total 8.36MWh)

    125kW hybrid storage inverters × 10 (parallel architecture)

    EMS (Energy Management System)

    PV DC coupling up to 2500kW

    Multi-port coupling: Grid / Generator / Critical Loads

   Liquid thermal loop: cold plates + piping + heat exchange unit

Key Technical Specifications

Item

Specification

Model

CESS-125K418

Total Battery Energy

8.36MWh

AC Output Power

1250kW AC

PV Input Capacity

2500kW DC

Parallel Capability

Up to 10 inverter sets

Battery Cabinets

Up to 20 units

Architecture

Hybrid On/Off-Grid

Ports

PV / Grid / Load / Generator

Cooling Method

Liquid temperature control

Applications

Microgrid / C&I ESS / Off-grid / PV-Diesel-Battery

From One Cabinet to an 8MWh Power Station (Parallel Expansion Path)

A defining advantage of CESS-125K418 is that system topology never changes while capacity scales linearly.

 Stage

Configuration

Total Capacity          

Typical Use

Single cabinet      

1 cabinet + 1 inverter  

418kWh

Backup / small C&I

5 in parallel

5 cabinets + 5 inverters

2.09MWh

Factory/hotel/farm

10 in parallel

10 cabinets + 10 inverters

4.18MWh

Industrial park

20 in parallel

20 cabinets + 10 inverters     

8.36MWh

Microgrid / PV plant / off-grid

Result: faster deployment, lower engineering complexity, and superior project repeatability for MWh-scale ESS.

Why Liquid Cooling Is Foundational for Large-Scale Parallel Systems

In MWh parallel operation, thermal management is no longer an optimization—it is a determinant of safety, lifespan, and consistency.

Liquid cooling enables:

Temperature deviation across 20 cabinets ≤ 3°C

Improved cell consistency and slower degradation

Significantly reduced thermal runaway risk

Stable operation under high load and high ambient temperatures

Lower maintenance frequency and acoustic noise

Liquid cooling is the underlying enabler of safe, long-term parallel operation.

Why Parallel Battery Cabinets Are Replacing Traditional Container ESS

Conventional containerized ESS often requires project-specific engineering.
CESS-125K418 Bess battery adopts standardized parallel cabinets, delivering:

    No DC busbar redesign

    Flexible transport and site placement

    Lower EPC engineering cost

   Shorter commissioning time

    High project replicability

Building an MWh station becomes modular—like assembling blocks.

Hybrid Microgrid Capability: Full PV / Grid / Gen / Load Coupling

Operational logic includes:

    Daytime PV priority for loads, surplus stored

    Nighttime battery discharge to reduce grid costs

    Millisecond off-grid transition during outages

    Generator engagement is only at low SOC

    EMS optimization by tariff, load profile, and weather

Ideal for unstable grids, hot climates, and remote locations.

Value to EPCs and System Integrators

    Reduced electrical design complexity

    Simplified DC aggregation and wiring

    Faster installation and commissioning

    Lower lifecycle O&M difficulty

    Standardized deployment for MWh projects

MWh ESS shifts from custom engineering to standardized implementation.

Typical Application Scenarios

    C&I peak shaving and tariff optimization

    Islands, mining sites, oil fields (off-grid)

    Hospitals, data centers, telecom (high reliability)

    Agriculture and manufacturing with an unstable supply

    PV plants with storage to improve self-consumption

Industry Outlook: The Future Form of MWh Energy Storage

The next generation of C&I and microgrid ESS will not rely on single large containers.
Instead, it will be based on standardized liquid-cooled battery cabinets in parallel architecture for flexible scaling and rapid deployment.

CESS-125K418 represents this emerging MWh power station architecture.

попереджати
Як стабільно працює система рідинного охолодження GSL Energy в умовах холодної зими в Україні?
Рекомендовано для вас
немає даних
Зв’яжіться з нами
Електронна пошта: sales@gsl-energy.com
Тел.: +86 755 84515360
Адреса: A602, Кіберпарк Тяньань, Північна дорога Хуанге, район Лунган, Шеньчжень, Китай
GSL ENERGY - Провідний постачальник зеленої енергії в Китаї з 2011 року

0086 13923720280

Контактна інформація про виробник акумулятора для зберігання сонячної енергії
Зв'яжіться з нами
whatsapp
Зверніться до служби обслуговування клієнтів
Зв'яжіться з нами
whatsapp
скасувати
Customer service
detect