It seems common sense to me, but maybe not all of them, all of my computers are on UPS battery backup.
One day I was frustrated when the Power flashed and immediately went out to buy a UPS.
Well, soon after, the power off took longer than the battery could keep my computer afloat.
I need a better solution!
I hope my UPS will last for at least 60 minutes in the event of a power outage.
I need more power!
My solution: car battery.
Material: rating is at least twice as many UPS as planned (
See step 8 for reasons). Wire (
12 or more;
Two different colors)
SolderHeat shrink tubbingcar battery with terminals on the top adapter that can go from car battery terminals to screw bars.
The wing nut is in the same size as the threaded rose curl terminals that will be installed on the screw bar.
Plastic case for your car battery fuse holder (radio shack)
30 amp fuse for bracket (any auto store)
Tools: ScrewdriversWire cuttersWire strippersSoldering irronscors (optional)
A hot gun or spare drill bitsI tries to power two computers (
Desktop and file server)
Two flat panel displays.
My total power consumption peak is about 500 watts. (yikes! )
Currently, I am running on two 300 W UPS (
Note: VA is not equal to WATTS.
Find the Watt level)
One monitor per computer.
Even though the two monitors are connected to the same computer, I need to distribute my power load more evenly to extend the battery life of my small UPS.
Note: After almost triggering a fire and destroying a UPS, I \'ve found a tough road where you need a UPS that is rated at least twice as much as you consume.
In this case, they cannot handle more than a few minutes of running time, but the battery dies before a problem occurs normally.
So now I know I need 500 watts and I need 60 minutes of power. .
This means: P/V = I500 W/120 V = 4.
16 am hours per hour (at 120 volts)
UPS batteries are usually 12 volts, but some are connected in series.
Take a look at your car first and make sure you don\'t need two car batteries.
So, let\'s say 12 volts, which means I need a battery with at least 41 volts after adjusting according to the voltage difference. 6 ampere hours. (
Yes I know UPS is inefficient but let\'s keep the math simple)
Unplug the UPS from the wall and unplug all the equipment from the wall.
Remove the screws that you have nothing to do and open the case.
If you are as lucky as I am, the battery will have terminals that you can slide off.
If not, cut the wire as close as possible to the battery.
Once you remove the battery, you will find what you see in pictureNOTE: pay attention to the polarity on the battery, and which wires when the polarity is.
The wires in the UPS are usually not long enough to reach where the battery is located.
We need to extend them to our car batteries.
Cut off the wire terminal (if any)
On the UPS wire.
At least 1/3/8 wires are stripped on the UPSStrip and at least 1/3/8 wires that we extend.
I helped me get a good connection with a metal curling edge, but this is optional.
Weld the wires together.
This solder joint needs to be able to handle high current.
We will get a lot of power through here and the UPS won\'t last long if we have a voltage drop.
After ensuring that the joint is welded well, place some heat shrink on it and seal it well.
Note: use colors that make sense to you so you can remember the polarity. Next, we need to leave a position for the wire and go to the car battery.
I drilled a hole.
Wire of any size can be used.
Add a strain relief device so you can\'t pull the joint you made and the PC board in the unit.
I just made a knot on each wire.
Next, pass the wire through the hole and carefully put the device back together.
Note: Remember the polarity!
Since this is a high current from a very high current source (car battery)
We need a fuse.
You want it to be as close to the battery as possible.
First, peel off the wires on the Fuse seat.
Place heat shrink on the wire.
Curl wire terminals or adapters of thread size on the battery holder to the wire. Then solder.
Nothing is complete before welding. Why solder?
It can generate electricity better.
The joint will not heat up and the voltage drop will not be so intense.
Then shrink the tubing.
On the other side of the fuse holder, peel off the wire, turn on the heat shrink, peel off the hot wire you recently added to the UPS and weld it together.
Once the contracted pipe is completed.
Next, use the same strategy as connecting to the on-line fuse holder to connect the curl terminal to the end of the ground wire, weld, and heat shrink.
Remember: Open the Heat Shrink tube before you finish.
When you\'re done, you should have something like this: Next, connect your battery terminal to the battery and then connect your wire to the terminal.
Insert the fuse in the fuse holder.
Open your UPS.
It will take a long time to charge the battery, but it will also last for a long time when there is a power outage.
Under this setting, my duration is about 1. 5 hours.
Be sure to put the battery in a covered plastic box, because if something goes wrong with the battery, you\'ll have as much acid as you can.
In addition, this will prevent you from dropping things and short-circuit the battery.
I learned in a difficult way. .
I spent a lot of money and almost got angry.
These UPS transformers are cheap.
They are not designed to run at 100% capacity over a long period of time (
For example, you will be able to use a battery of this size)
The transformer melted when I ran the UPS at 300 W for more than 30 minutes.
When I took out my infrared temperature timing, its reading was close to 400 degrees F! !
I had to redesign my system.
I chose two UPS with a rated power of 600 W but with 24 V (
2 12 V Series batteries).
I have two car batteries under my new settings, so I have more than four hours of backup capacity.

GET IN TOUCH WITH Us
recommended articles
SERVICE INFO CENTER Inverter Compatibility
How to Choose a Solar Battery Storage Supplier? — GSL ENERGY Professional Guide
If you need solar battery storage, the first step is often to find a reliable solar battery storage supplier. However, with so many brands and platforms on the market, how to find a solar battery storage supplier worth long-term cooperation is indeed a challenge for many customers. As a lithium iron phosphate energy storage manufacturer with 15 years of experience and exports to 138 countries, GSL ENERGY has summarized the following key points for you.
Six major energy storage products on display!  GSL ENERGY debuts at the World Battery and Energy Storage Industry Expo
From August 8 to 10, 2025, GSL ENERGY will debut at the 10th World Battery and Energy Storage Industry Expo.
Ghana Solar Power Storage Solutions | GSL ENERGY, a One-Stop Energy Storage System Supplier
Frequent power outages, rising electricity prices, and high costs of diesel-powered generators have made stable power supply a critical need for businesses and households in Ghana. With 15 years of experience in lithium-ion battery manufacturing, GSL ENERGY provides a comprehensive solar energy storage solution tailored for the Ghanaian market—including solar panels, energy storage batteries, inverters, and energy management systems. This solution helps you achieve energy independence, reduce operational costs, and is certified by international standards such as CE, IEC, and UL, ensuring seamless export compliance.
60kWh Energy Storage Battery and Solar Panel/Inverter Operating Principles
In modern energy applications, the combination of solar panels and energy storage batteries has brought unprecedented energy independence and economic benefits to residential, commercial, and industrial users. By storing excess electricity generated during the day in a 60kWh energy storage battery, you can not only maintain power supply during nighttime or inclement weather but also release electricity during peak pricing periods, or even sell excess power back to the grid, achieving a win-win scenario of green, low-carbon living and financial gains. This article will provide you with a comprehensive understanding of the working principles and advantages of the 60kWh energy storage battery, solar panels, and inverters.
2025 Solar Battery Storage System – GSL Energy Solutions
From residential Powerwall batteries to high-voltage liquid-cooled BESS cabinets, GSL ENERGY is leading the way in delivering safe, efficient, and scalable energy storage solutions. In 2025, we continue to push boundaries with advanced HV architecture, modular scalability, and global-certified products – powering homes, businesses, and large-scale industrial projects across 138 countries.
GSL ENERGY Deploys 240kWh Energy Storage System in Caribbean Metro Station to Ensure Public Transport Energy Security
GSL ENERGY has successfully deployed a 240kWh lithium-ion battery energy storage system in a metro station in a major Caribbean city, providing continuous and stable power for lighting, air conditioning, and key control equipment in the station. This significantly enhances the emergency energy capacity and operational reliability of the local public transport system.
no data
 Service Tel: +86-755-84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leader of green energy provider in china since 2011

0086 13923720280

Solar energy storage battery manufacturer contact information
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect