National energy bureau in August 2019, the national electric power production safety situation

In August, is not a direct economic loss of 1 million yuan of above of power equipment accident, compared to the same). 'Photovoltaic (pv) of the world' this is a comprehensive system to introduce the development of photovoltaic (pv) in the past, present and future the sum of the corpus, wide-ranging, can meet the needs of different readers. Not power construction casualty accidents, the company cost control scheme; reduce year-on-year fewer deaths in 3, 3 people. Note: the above data to perform the electricity safety accident emergency disposal and investigate ordinance ( The State Council decree 599), , system engineering graduate prospects regulations on the report and the investigation and handling of production safety accident ( The State Council decree 493), And the National Energy Administration about the printing & lt; Among them, 4 power production life or personal injury accidents occurred, four people death, compared to the same; 3, the death toll increases 3 people; Chuxiong lucheng power supply bureau 1 homework personnel, upon completion of the replacement of 10 kv drop fuse to repair work, found that lightning arrester is flawed, occurred in the process of climbing view person get an electric shock, killing 1 person. Solar wall glass northwest electric power construction third engineering co. , LTD. China resources haifeng project site inspection department no. 1 furnace EE3 powder piping, solar panels to power 1 workers fell to the boiler furnace top 15 from the scaffold. 5 meters running platform, fell about 12 meters high, after the rescue invalid death. Notice ( It security [2014] no. 205) And the National Energy Administration about electric power safety accident issued by the single power supply city hierarchy standard notice ( Youngsters who Ann [2013] no. 255) 。

responsible for hailar east power plant heat preservation demolition installation and scaffolding, sub-contractor construction team Jin Run power engineering co. , LTD. Three construction workers, entered the work site ahead of no. 3 furnace without permission for hanging lighting and removal in the hearth furnace scaffolding operations preparation. Outsourcing unit of sichuan xin shun industrial co. , LTD. Workers in xigaze JiDing substation of 110 kv power supply company belong to 10 kv switch room to carry on the exterior wall paint job, how solar panels generating solar wall glass workers accidentally touch the electric equipment in the process of mobile scaffold, killing 2 people get an electric shock, including one death disables via rescue. 3. On August 16, 2019, hulun buir antai thermoelectric limited liability company hailar east plant personal casualty accident, one person was killed. Happened in August 2019, the national electric power 4 4 personal casualty accidents, death, accident) compared to the flat, the death toll was flat. This paper not only includes editor Wolfgang & middot; Dr Parr, herself, in its new energy career of more than 50 years, the deep understanding of the development of photovoltaic (pv) and system summary, also include the global photovoltaic industry professionals engaged in new energy or a review of the photovoltaic difficult development, 1. On August 1, 2019, southern power grid of yunnan power grid co. , LTD. Personal casualty accident chuxiong lucheng power supply bureau, one person was killed. 4. On August 18, 2019, guangdong China resources power ( Hai feng) Co. , LTD. , personal casualty accident, one person was killed. Not power security incidents, ecri compared to the flat. Solar photovoltaic (pv) network statement: this information is reproduced from the media or other Internet web site, network cooperation photovoltaic network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. Electric power security incidents supervision and management regulations & gt; 2. On August 15, 2019, its Chinese Tibet electric power co. , LTD. , personal casualty accident xigaze power supply company, one person was killed. One construction personnel to enter the scene to non-working area, from 30. 5 meters furnace cyclone separator entrance off 3 to 12 m return feeder, after the rescue invalid death. In August, the country did not occur more than larger power personal casualty accident, no power equipment accident, no power system of hydropower station dam collapse dam, circumstances and events have a significant impact to society. The article content is for reference only.

GET IN TOUCH WITH Us
recommended articles
SERVICE INFO CENTER Inverter Compatibility
GSL ENERGY CESS-J125K261 Commercial & Industrial Energy Storage System Officially Obtains CE EMC Certification
Due to the increasing concerns over safety, stability, and grid compliance in the commercial and industrial (C&I) energy storage market, GSL ENERGY launched its new-generation 125kW/261.2kWh C&I energy storage system – the CESS-J125K261 – which has now officially obtained CE EMC (Electromagnetic Compatibility) certification. This milestone proven the product's compliance for market in Europe and other markets.
KPMG 2025 Top 50 New Energy Technology Companies List, GSL ENERGY Earns Recognition
KPMG China's New Energy Technology Enterprise 50 ranking was recently unveiled, with GSL ENERGY securing a place through its technological innovation and engineering expertise in the new energy storage sector, demonstrating its comprehensive competitive edge within the industry.
Commercial Energy Storage vs Diesel Generators
For decades, diesel generators have been the default backup power solution for commercial and industrial users. However, by 2026, rising fuel costs, stricter environmental regulations, and the demand for energy resilience are forcing businesses to reassess this traditional option.Commercial battery energy storage systems (ESS) are no longer viewed as experimental alternatives. In many scenarios, they now outperform diesel generators in total cost of ownership, operational reliability, and long-term strategic value.This article provides a clear, business-oriented comparison to help decision-makers choose the right solution for their facilities.
no data
  Tel: +86 755 84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leading green energy supplier in China since 2011

0086 13923720280

Solar energy storage battery manufacturer contact information
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect