loading

 sales@gsl-energy.com     0086 13923720280

Photovoltaic power station photovoltaic solar photovoltaic application huaneng zhanhua wind lake bracket fastening project tender announcement

This project subject to tender huaneng zhanhua lake breeze photovoltaic bracket fastening photovoltaic power station project bidding for huaneng power co. , LTD. Shandong huaneng zhanhua photovoltaic power generation co. , LTD. , a project subject to tender self-raised capital source for the enterprises, the project has the tender conditions, photovoltaic power station of huaneng zhanhua wind lake photovoltaic bracket fastening project for public bidding.

  2. 4 the bidding scope and content: the wind lake photovoltaic (pv) 1, 3, 4 stents to tighten all bolts ( The lack of a filling) , then add back cap screw, the top beam and oblique beam with throat hoop tighten, temporary 14000 groups of bracket of quantities, according to the actual quantity settlement.

the bidder shall be quoted in China huaneng group co. , LTD. And its subordinate unit of qualified suppliers, and not in the supplier to suspend the tender within the time limit, To have e-commerce platform in China huaneng group co. , LTD registered as potential suppliers, potential suppliers must pass group co. , LTD. , the secondary units and various grass-roots enterprise audit rear can become a qualified suppliers to participate in bidding. For not registered in China huaneng group co. , LTD. , e-commerce platform supplier, first of all should be registered in China huaneng group co. , LTD. , e-commerce platform to become a potential suppliers, potential suppliers through group co. , LTD. , the secondary units and various grass-roots enterprise audit rear can become a qualified suppliers to participate in bidding) 。

  3. 2. 1 a bidder shall have the qualifications of requirements: the bidder should have power engineering construction general contracting qualification level 3 and above level 3 and above qualifications, or power transmission and transformation engineering contracting and safe production license within the period of validity.

  4. 1 the project through electronic business platform (China huaneng group co. , LTD. ) Whole process of electronic bidding, qualified bidders of interest may since 9 PM on May 7, 2020 to May 15, 2020, 17 ( Beijing time) , China huaneng group co. , LTD. , e-commerce platform to buy and download the tender documents.

  4. 2. 1 the bidder in the tender documents on May 7, 2020, 9 during sale up to May 15, 2020, 17 ( Beijing time) Can be online purchase the bidding documents, click on the left side of the shortcut menu & other; Buy the tender documents & throughout; & the other; Purchase & throughout; To buy or click & other button; Add to cart & throughout; After choosing & other; Throughout my cart &; To buy in bulk, the bidding documents of payment only support online payment, Personal online banking) , please check your bank account before pay online payment for single limit of not less than the tender documents.

  4. 2. 2 buy the tender documents, in the purchase page to fill in the contact must be business contacts, this bid during the period of bids, clarification, evaluation of SMS notification will be sent to this contact, all the clarification will inform the contact person.

  4. 2. 3 after the success of the tender document fee payments can download the tender documents. After landing successful bidders, click & other; Bidding management - - > File download & throughout; , must first click on the confirmation of the download on the right side of the page to view and download the tender documents. Click on the file name, choose & other; Save as & throughout; Endure to the phone. Besides the tenderer or the cause of the procuratorial agency, once sold, the tender documents will not be refund.

  5. 1 a bidder shall be stipulated in the tender documents to submit the bid documents prior to the deadline of log in e-commerce platform, to complete the transfer of his bid documents submitted, submit the bid documents submitted prior to the deadline not completed as give up bidding qualification. E-commerce platform automatically shut down after bidding deadline to submit his bid documents, China solar energy network, refused to accept submitted after the deadline for submitting tender documents.

  5. 2 bidders please submit deadline on e-commerce platform into the bidding documents submitted page. The bidder shall, in accordance with the e-commerce platform of computer and network environment required to prepare, solar panels, because of the bidders to computer configuration or do not conform to the requirements of the electronic commercial platform and network environment lead to submit the decryption failure, solar energy, the consequences shall be borne by the bidder.

  5. 3 submitted after the deadline, a procuratorial agency online bid opening, each bidder online decryption their bid documents. The bid opening process record on file for future reference.

  5. 4 electronic bidding documents submission deadline: 00 when on May 18, 2020, 15 points; The bid opening time ( Electronic bidding documents to decrypt the start time) : with the electronic bidding document submission deadline.

the tender announcement in the electronic commerce platform (China huaneng group co. , LTD. ) Release. Because of trusting other organizations, individuals, or media information loss caused by the tenderer, the procuratorial agency is not responsible for.

solar photovoltaic network statement: this information is reproduced from the power grid cooperation media or other Internet website, solar photovoltaic network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. The article content is for reference only.

this paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. Among them, the solar energypanels, EPC project owner units is given priority to with soe/state, this also reflected from the side, solar power grid, in project bidding and parity, the state-owned enterprises have become the absolute main force. Specifically, CGNPC in development of 410 mw, 603 mw, guangzhou energy saving 220 mw, 345 mw, jin can group the people vote for 200 mw, 190 mw hubei energy group, huaneng power 180 mw

In today's world, have risen to an unexpected level of lifepo4 battery. It has gained a lot of popularity and has come up with different kinds of variations in its content.

Providing highly qualified 12v 50ah lithium battery products and services, GSL GROUP Limited is committed to helping clients make lasting improvements to their performance and realize their most important goals. Over the past decades, we’ve built a firm uniquely equipped to this task. Go to GSL ENERGY for more info.

GSL GROUP Limited has unique staffs who will serve you with their best ideas by affording you with high-quality service.

If our brand is successful and consistent, it will be much easier to initially grab customers and encourage them to purchase lifepo4 battery 12v further.

The global market is estimated to reach a value of almost lifepo4 battery producers in the next decade. have a robust position in the lifepo4 battery market because of its proven high potency in lifepo4 battery producers.

GET IN TOUCH WITH Us
recommended articles
SERVICE INFO CENTER Inverter Compatibility
Egypt's Solar Power Market and Opportunities — GSL ENERGY's Photovoltaic and Energy Storage Solutions

In recent years, frequent fuel crises and soaring natural gas import costs have forced Egypt to re-evaluate its energy structure and accelerate its investment in photovoltaic power generation to address increasingly severe energy supply challenges. This transition not only brings hope for Egypt's energy security but also opens new market opportunities for Chinese photovoltaic and energy storage manufacturers, including GSL ENERGY.
GSL ENERGY's Battery Energy Storage System (BESS) and Solar Solutions in Bulgaria

In 2024, GSL ENERGY completed a 7.45 MW battery energy storage system (BESS) in Bulgaria, which is used in conjunction with a large-scale solar photovoltaic power plant to provide stable, clean electricity to remote areas. The implementation of this project not only improved the utilization rate of renewable energy in the local area but also alleviated the pressure on Bulgaria's power grid.
How to Choose a Solar Battery Storage Supplier? — GSL ENERGY Professional Guide
If you need solar battery storage, the first step is often to find a reliable solar battery storage supplier. However, with so many brands and platforms on the market, how to find a solar battery storage supplier worth long-term cooperation is indeed a challenge for many customers. As a lithium iron phosphate energy storage manufacturer with 15 years of experience and exports to 138 countries, GSL ENERGY has summarized the following key points for you.
Six major energy storage products on display!  GSL ENERGY debuts at the World Battery and Energy Storage Industry Expo
From August 8 to 10, 2025, GSL ENERGY will debut at the 10th World Battery and Energy Storage Industry Expo.
Ghana Solar Power Storage Solutions | GSL ENERGY, a One-Stop Energy Storage System Supplier
Frequent power outages, rising electricity prices, and high costs of diesel-powered generators have made stable power supply a critical need for businesses and households in Ghana. With 15 years of experience in lithium-ion battery manufacturing, GSL ENERGY provides a comprehensive solar energy storage solution tailored for the Ghanaian market—including solar panels, energy storage batteries, inverters, and energy management systems. This solution helps you achieve energy independence, reduce operational costs, and is certified by international standards such as CE, IEC, and UL, ensuring seamless export compliance.
60kWh Energy Storage Battery and Solar Panel/Inverter Operating Principles
In modern energy applications, the combination of solar panels and energy storage batteries has brought unprecedented energy independence and economic benefits to residential, commercial, and industrial users. By storing excess electricity generated during the day in a 60kWh energy storage battery, you can not only maintain power supply during nighttime or inclement weather but also release electricity during peak pricing periods, or even sell excess power back to the grid, achieving a win-win scenario of green, low-carbon living and financial gains. This article will provide you with a comprehensive understanding of the working principles and advantages of the 60kWh energy storage battery, solar panels, and inverters.
2025 Solar Battery Storage System – GSL Energy Solutions
From residential Powerwall batteries to high-voltage liquid-cooled BESS cabinets, GSL ENERGY is leading the way in delivering safe, efficient, and scalable energy storage solutions. In 2025, we continue to push boundaries with advanced HV architecture, modular scalability, and global-certified products – powering homes, businesses, and large-scale industrial projects across 138 countries.
no data
 Service Tel: +86-755-84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leader of green energy provider in china since 2011

0086 13923720280

Solar energy storage battery manufacturer contact information
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect