loading

 sales@gsl-energy.com     0086 13923720280

Solar power generation in guangdong requested on March 10th submitted 2020 photovoltaic parity on the project

The key support has grid or the verification ( For the record) The period of validity, need the state financial subsidies ( Contains 2019 bid project) Voluntary to parity projects online. In 2019 countries published the first batch of wind power, photovoltaic power generation parity project, if you need to adjust, solar energy, please will project information, See attachment 2) And submit our bureau. Qian xuesen theory of systems engineering from the National Development and Reform Commission of guangdong province, today ( 18) , energy bureau of guangdong province issued 'about 2020 please submit the annual wind power, photovoltaic power parity project notice, requirements in accordance with the relevant declaration conditions and work requirements, around the solar portal, on March 10 to submit the application materials. To actively promote parity project construction, solar panels, promoting wind power, solar silicon wafer production manufacturer is sustained and healthy development of photovoltaic power generation, solar silicon wafer production factory in 2020, according to the National Energy Administration relevant working arrangements and the National Energy Administration of the National Development and Reform Commission on promoting wind power, photovoltaic power generation subsidies, parity project notice ( Hair change energy [2019] 19) Related documentation requirements, do it right now, 2020 wind power in our province, a set of monitoring equipment diagram photovoltaic parity work of project application, notice the following: (on the Internet A) Please actively coordinate grid companies to declare the parity of projects around the demonstrated ability to access and given, and the qualified project issued by the grid and given access to the support, solar power network, supporting opinions issued according to a single project, unification issue can also be used for multiple projects. ( 2) To declare the project can be approved by the end of 2020 ( For the record) And start construction. What is the silicon material ( 2) Please declare the enterprises will be organized around, to declare par project information table ( See appendix 1) , power grid access and given support to our bureau, has been approved ( For the record) The project needs to submit for approval at the same time ( For the record) File.

and solar energy

GET IN TOUCH WITH Us
recommended articles
SERVICEs INFO CENTER Inverter Compatibility
Meet GSL ENERGY at the 2026 Guangzhou Asia-Pacific PV & Energy Storage Expo
GSL ENERGY will exhibit at the 2026 Guangzhou Asia-Pacific PV & Energy Storage Expo from September 16–18. Visit Booth 9.2C321 to discuss residential battery storage, C&I BESS, customized solutions, and global partnership opportunities.
20kWh High-Voltage Energy Storage Battery with Deye Inverter Installed in Mongolia
GSL ENERGY supplied a 20kWh high-voltage LiFePO4 energy storage battery for a residential installation in Mongolia. Paired with a 100A high-voltage control box and a Deye hybrid inverter, the indoor system stores solar electricity and supports selected household loads during grid interruptions.
1 MW Battery Storage Cost for Commercial Projects: Pricing, Customization and Bulk Procurement Guide
Planning a 1 MW battery storage project? This guide helps EPCs, developers, integrators, and distributors understand system costs, 1–4 MWh configurations, customization options, the scope of quotations, and bulk procurement requirements before requesting a commercial BESS proposal.
Commercial & Industrial Energy Storage Systems: A Practical Guide for Businesses
Commercial and industrial energy storage is becoming an important tool for businesses looking to control electricity costs, improve solar self-consumption, manage peak demand, and strengthen backup power. This guide explains how C&I energy storage systems work, how to determine the right power and battery capacity, and what to consider when comparing system architecture, cooling technology, safety, ROI, and project requirements.
Why On-Site Engineering Support Matters for Battery Energy Storage Systems
A BESS project involves more than battery hardware. Explore why on-site engineering support, BMS verification, commissioning, and system integration matter for reliable energy storage—and how GSL Energy supports projects in the Middle East.
GSL ENERGY and Garman Energy Sign Strategic Partnership to Advance Energy Storage Solutions in Yemen
Shenzhen, China — GSL ENERGY, a global manufacturer of lithium battery energy storage systems, has officially signed a strategic cooperation agreement with Garman Energy (Hamoud Garman Brothers Trading Co., Ltd.), a Yemen-based energy company, to accelerate the adoption of advanced energy storage solutions and support sustainable energy development in Yemen.
  Tel: +86 755 84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leading green energy supplier in China since 2011

0086 13923720280

Solar energy storage battery manufacturer contact information
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect