loading

 sales@gsl-energy.com     0086 13923720280

Solar power to the National Energy Administration decided to abolish retains the revision of the normative documents directory

For carrying out the party central committee under the State Council about to strengthen the construction of government under the rule of law and decentralization, the pipes and advancement, photovoltaic beat heat storage material with what mechanical network monitoring schemes offer network monitoring scheme optimization service demands and create a good business environment, the National Energy Administration and the state electricity regulatory commission issued by the regulatory documents for clearing, decided to abolish the file 114, solar panels, retain file 375 solar energy equipment, solar portal, and probes into the original documents issued by the state electricity regulatory commission 68 revised. Recently, the National Energy Administration issued announcement no. 7, 2019, China solar energy network, decided to abolish the file 114, retain file 375 solar energy equipment, polycrystalline silicon reduction furnace and picture of the original documents issued by the state electricity regulatory commission 68 revised. Which decided to abolish photovoltaic one policy, decided to keep the pv policy 19, one proposed revision of the photovoltaic (pv) policy, photovoltaic hole with what machinery play a total of 21 items involved in photovoltaic (pv) policy. Heat storage material will abolish the normative documents directory, the standardization of the polycrystalline silicon reduction furnace pictures keep file directory and revision of the normative documents directory make a public announcement.

GET IN TOUCH WITH Us
recommended articles
SERVICEs INFO CENTER Inverter Compatibility
What are the differences between lithium-ion batteries and solid-state batteries?
Lithium-ion batteries and solid-state batteries are two different types of battery, and there are a number of differences between them in terms of structure and performance.
How Long Does a Drone Battery Last?
Drone battery endurance is a key performance indicator across applications—from FPV racing to aerial photography and heavy-duty industrial UAV operations. However, flight time is not fixed; it varies depending on battery technology, system design, and operational conditions.
BESS in Germany: GSL Energy Multiple 1-2.6MWh Energy Storage Projects Have Been Implemented
GSL Energy has seen a number of multi-scenario MW-scale projects come to fruition, further enhancing its global delivery capabilities across the commercial, industrial and storage sectors.
no data
  Tel: +86 755 84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leading green energy supplier in China since 2011

0086 13923720280

Solar energy storage battery manufacturer contact information
Contact us
whatsapp
Contact customer service
Contact us
whatsapp
cancel
Customer service
detect