loading

 sales@gsl-energy.com     0086 13923720280

Solar power using solar power system power supply unicom 5 g network has covered the mountain

On April 20, on more than 5000 meters of altitude, risking minus ten degrees cold, China unicom to realize Everest observation deck and Everest base camp number one complete coverage of 5 g.

since April, combines the condition of mt. Everest is net, photovoltaic (pv) grid, China unicom started the construction of 4 g, 5 g. Due to Everest base camp and above area belongs to the national nature reserve, in the construction area shall be forbidden to use large equipment, China unicom, more than 10 construction personnel arrangement, in the form of shoulder hand carry handling, antenna, fiber optic cable accessories, and other construction materials to an altitude of 5000 meters of mount Everest observation deck and a camp at an altitude of 5200 meters, solar equipment, complete preparation for construction.

it is known that the solar portal, China unicom, 4 g / 5 g base station according to the natural environment to Everest using solar power system for power supply, not only ensure the energy supply base station operation, and the maximum in the new energy to protect the Everest, in saving the operating costs at the same time of reducing pollution.

China unicom after more than 10 days of project construction, solar power grid, complete the Everest camp two observation deck and 1 2 4 g base stations and 2 5 g base station installation, adjustment and network optimization.

solar portal

GET IN TOUCH WITH Us
recommended articles
SERVICE INFO CENTER Blogpost
no data
 Service Tel: +86-755-84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leader of green energy provider in china since 2011

0086 13923720280

Solar energy storage battery manufacturer contact information
Contact us
whatsapp
contact customer service
Contact us
whatsapp
cancel
Customer service
detect