A "Soft Start Fault" alarm is typically triggered when abnormal voltage is detected on either the AC or DC side during system power-up. If this alarm occurs, please follow the troubleshooting steps below:
Check Grid Voltage Fluctuations
Verify whether the grid-side voltage is stable and whether there are significant fluctuations or momentary power outages. Abnormal grid voltage may prevent the system from performing a normal soft start.
Check Photovoltaic (PV) Voltage
Confirm whether the output voltage of the PV modules exceeds the maximum allowable limit for the device:
For three-phase systems: PV voltage must not exceed 1000 V
For single-phase systems: PV voltage must not exceed 600 V
If the PV voltage exceeds the limit or the grid is unstable, resolve these issues first before attempting to restart the system.
GSL ENERGY recommends that during any soft start fault troubleshooting, always prioritize checking the voltage source and fluctuations to ensure safe system startup and protection of the energy storage equipment.
verlieben
Why Is My PV Not Generating Power?
Why sell electricity back to the grid when electricity prices are low?
Nächster
Related questions
4
Why Is My PV Not Generating Power?

PV generation can be impacted by system configuration, electrical connections, and site environmental conditions. Please check the following items step by step.

1) System Settings Check

Operating Mode / EMS Control
If the system is under EMS scheduling or special operating modes (e.g., time-of-use strategy, grid-priority, or remote dispatch), PV output may be limited by the control logic.
→ Verify current mode on the inverter/EMS monitoring platform.

Export Limitation / Zero Export Setting
When Export Limitation (Zero Export) is enabled, and the battery has reached its charge cut-off SOC, while site loads are low, the inverter will intentionally reduce or stop PV generation to prevent exporting to the grid.

Battery Priority Logic
If the battery is already fully charged and the load demand is low, PV generation will automatically decrease.

System Alarms or Faults
Check the inverter or monitoring APP for any active alarms related to PV input, grid, battery, or meter communication.

2) Cable Connections & Electrical Inspection

Smart Meter / CT Installation
An incorrect meter or CT direction will cause wrong power readings, leading the system to misjudge the load and suppress PV output.
→ Confirm meter wiring direction and phase sequence.

PV Polarity & Connection
Use a multimeter to measure PV string voltage and confirm:

Correct polarity (no reverse connection)

Stable DC voltage within normal range

PV Start-up Voltage Too Low
If the PV voltage is below the inverter start-up threshold, PV will not activate.

Single-phase inverter: PV ≥ 120V

Three-phase inverter: PV ≥ 220V

PV Voltage Too High (Overvoltage Protection)
If the PV string voltage exceeds the inverter protection limits, the inverter will stop accepting PV input.

Single-phase inverter: PV ≤ 600V

Three-phase inverter: PV ≤ 1000V

PV Connector / MC4 Contact Issue
Loose or poorly crimped MC4 connectors can interrupt PV input intermittently.

3) Environmental & Site Conditions

Weather & Irradiation
Cloud cover, high temperature, or low sunlight intensity will directly reduce PV output.

Shading on Panels
Shadows from buildings, trees, dust, or panel orientation issues can significantly limit PV generation.

Load Demand vs. Zero Export Logic
In zero-export scenarios, PV generation is dynamically adjusted according to real-time load consumption.

If the battery is full

The load is low

Zero export is enabled
→ PV output will be reduced intentionally by the inverter.

4) Recommended Troubleshooting Steps

Check inverter/EMS monitoring for alarms

Verify meter/CT wiring direction

Measure PV string voltage with a multimeter

Confirm PV polarity and connector condition

Check battery SOC and export limitation settings

Inspect panels for shading or dirt

keine Daten
Mach mit uns in Kontakt
Tel: +86 755 84515360
Adresse: A602, Tianan Cyber ​​Park, Huangge North Road, Bezirk Longgang, Shenzhen, China
GSL ENERGY – Ein führender Ökostromanbieter in China seit 2011

0086 13923720280

Kontaktinformationen des Solarenergiespeichers Batterie Hersteller Hersteller
Kontaktiere uns
whatsapp
Wenden Sie sich an den Kundendienst
Kontaktiere uns
whatsapp
stornieren
Customer service
detect